Contact:

MEMO Group HQ
Wata el Mouseitbeh, Al Safa Building, Block B, 1st Floor, Beirut  
tel. +961 1 706 138
e-mail:
memo@memosarl.com

Get in touch:

Send
Send
Your message was sent - Thank you!
Completează toate câmpurile obligatorii!

Copyright 2025, MEMO Group

31 decembrie 2014

AUB Administrative Building – Modern MEP Systems for a Landmark Facility

 

Located in the heart of Beirut, the AUB Administrative Building project was a major infrastructure development for the American University of Beirut (AUB), aimed at centralizing and modernizing the university’s administrative operations. Delivered by MEMO between September 2012 and December 2014, the project reflects a comprehensive upgrade in mechanical systems aligned with international standards for comfort, efficiency, and safety.

Under the guidance of consultant Rafic Khoury, MEMO handled the complete mechanical scope, with an EM contract value of $1.3 million USD. The project involved integrating high-efficiency HVAC and plumbing systems into a complex institutional environment, with a focus on long-term sustainability and performance.

Systems Installed by MEMO:

  • Chillers

  • Chilled & Heating Water Systems

  • Steam Network

  • Plumbing & Pumps

  • Air Handling Units (AHUs)

  • Fan Coil Units (FCUs)

  • Ventilation Systems

  • Firefighting Network

  • Building Management System (BMS)

The building now serves as a vital hub for AUB’s internal operations, and MEMO’s contribution ensured that the facility operates with optimal climate control, water management, and safety systems. Careful coordination was required to align technical works with architectural design and institutional usage standards.

The AUB Administrative Building showcases MEMO’s ability to deliver tailored mechanical solutions in high-profile academic and administrative environments.