MEMO Group HQ
Wata el Mouseitbeh, Al Safa Building, Block B, 1st Floor, Beirut
tel. +961 1 706 138
e-mail: memo@memosarl.com
Copyright 2025, MEMO Group
As part of the American University of Beirut’s ongoing efforts to enhance campus safety, MEMO was contracted to deliver the MEP works for the Central Fire Station, a critical facility supporting fire protection across the university grounds.
Executed between January 2008 and March 2009, and valued at $410,000 USD, this project was developed in close coordination with the AUB in-house consultancy team. Located in the heart of Beirut, the project involved the installation of specialized systems to ensure immediate emergency response and continuous fire protection coverage.
Scope of Systems Installed by MEMO:
Fire Pump Station – Centralized high-capacity pumping system to serve the campus-wide firefighting network
Fire Alarm System – Advanced detection and alert system integrated across key campus zones
Electrical Panel Boards – Supporting control and distribution for all MEP and safety-related systems
The AUB Central Fire Station serves as the command center for fire response coordination, and its systems are designed to operate under demanding conditions, ensuring reliability and compliance with international safety standards.
MEMO’s role covered complete installation, testing, and commissioning of all systems, further reinforcing our track record in mission-critical, institutional infrastructure projects.