28 iulie 2011

AUB Utility Tunnel – Vital Infrastructure Beneath a Historic Campus

 

The AUB Utility Tunnel project, delivered for the American University of Beirut (AUB), was a strategic infrastructure upgrade designed to streamline and secure the distribution of essential electro-mechanical systems across the campus.

Spanning from December 2010 to July 2011, and completed under the consultancy of AME, the project focused on the construction and MEP outfitting of a dedicated utilities tunnel beneath the university grounds in Beirut, Lebanon. With a contract value of $450,000 USD, MEMO was entrusted with the complete MEP scope, ensuring robust and efficient utility management for years to come.

Systems Installed by MEMO:

  • Chilled Water Piping

  • Steam Piping

  • Firefighting Network

  • Domestic Water Supply

  • Mechanical Ventilation

  • Fire Alarm System

  • Building Management System (BMS)

  • Lighting and Power Distribution

The tunnel enables secure and centralized routing of critical services, significantly reducing surface-level interventions and improving long-term maintenance capabilities. MEMO’s work involved detailed coordination, precision installation in confined underground spaces, and integration with existing campus systems—all executed within a tight timeframe and active university environment.

This project reflects MEMO’s expertise in institutional infrastructure, especially in complex, operational environments where reliability and technical precision are paramount.