Contact:

MEMO Group HQ
Wata el Mouseitbeh, Al Safa Building, Block B, 1st Floor, Beirut  
tel. +961 1 706 138
e-mail:
memo@memosarl.com

Get in touch:

Send
Send
Your message was sent - Thank you!
Completează toate câmpurile obligatorii!

Copyright 2025, MEMO Group

30 iunie 2016

FPDU 152B – Chiller Plant Extension at AUB, Beirut

 

The FPDU 152B project marks a key infrastructure upgrade for the American University of Beirut (AUB), one of the most prestigious educational institutions in the region. Executed between March 2015 and June 2016, this project involved the extension of the university’s existing chiller plant, with a strong focus on energy efficiency, reliability, and integration with current systems.

Under the supervision of Consultant BARBANEL, and delivered by MEMO, the scope of work covered complete MEP design and execution. The $800K EM contract included the installation of:

  • Chilled water distribution systems

  • High-performance chillers

  • Circulation pumps

  • Power supply systems

  • An integrated Building Management System (BMS) for centralized control and monitoring

Situated in Beirut, Lebanon, this project required seamless coordination with ongoing campus operations, ensuring minimal disruption while upgrading the plant’s capacity to support expanded academic and research facilities.

MEMO’s involvement included not only equipment installation but also system testing, commissioning, and handover, reflecting our turnkey approach to complex MEP works.

FPDU 152B stands as a solid example of MEMO’s capability to deliver technically demanding projects in active, high-profile environments, reinforcing our reputation in the institutional and infrastructure sectors.