Contact:

MEMO Group HQ
Wata el Mouseitbeh, Al Safa Building, Block B, 1st Floor, Beirut  
tel. +961 1 706 138
e-mail:
memo@memosarl.com

Get in touch:

Send
Send
Your message was sent - Thank you!
Completează toate câmpurile obligatorii!

Copyright 2025, MEMO Group

18 aprilie 2025

Ras Maska School - in progress

Education demands environments that are safe, efficient, and equipped for the future — and MEMO is delivering just that through its ongoing work on a state-of-the-art educational facility.

With a contract value of USD 1.55 million, this project involves the full implementation of advanced MEP (mechanical, electrical, and plumbing) systems designed to support both the day-to-day operations and long-term sustainability of the institution.

Scope of Work & Installed Systems

MEMO’s scope on this project includes the installation of a wide range of critical systems:

  • Electrical infrastructure including lighting, power systems, panel boards, and UPS

  • Life safety systems: fire alarm, CCTV, and SMATV

  • Earthing and lightning protection

  • Water supply and drainage systems

  • Full HVAC setup using DX units and VRV systems

  • Ventilation and water treatment systems

 

Each component is being designed and executed to ensure comfort, safety, and energy efficiency across all areas of the facility — from classrooms and labs to administrative and common spaces.

This project goes beyond basic systems. It's about building the backbone of a learning environment that inspires growth, innovation, and well-being. With work currently in progress, MEMO continues to bring its technical precision and on-site excellence to every stage of the build.